Fire Water Project

May 7, 2021 |

CD&H is currently working on a Fire Water Project for HFC- El Dorado. This consist of installing 10,000′ of poly piping, varying from 18″ to 30″ in size. This will serve as the new primary feed lines carrying water to the firefighting equipment, and will control measures throughout the refinery.